The results of this study found that there are 4 risks with 26 sub-risks, of which there are 6 sub-risks that are prioritized and require risk management. The application of risk assessment consists of 3 stages, namely risk identification, risk analysis, and risk evaluation. So in this study using ISO 31000 as a framework in analyzing potential risks. Walaupun suatu Proyek konstruksi merupakan kegiatan telah direncanakan sebaik suatu bidang yang dinamis dan mungkin, namun tetap mengandung mengandung risiko. DMC are project risks such as technical, cost, and project scheduling which are sometimes not in accordance with the established plan and cause cost and time losses to the company. Kata Kunci : Manajemen resiko, proyek konstruksi 1. Some of the risks that are often faced in working on software projects at PT. DMC has not implemented risk management for every software development project it has worked on. DMC is committed to being a trusted IT and control system company.
As an information technology company, PT.
Duta Media Cipta (DMC) is a control system and IT company based in the city of Surabaya, this company focuses on procurement, maintenance and repair services for ship equipment, both mechanical and electrical. ISO 31000 : 2018, Manajemen risiko, Analisis risiko, Control System Abstract Identifikasi Faktor Risiko Keselamatan Pada Proyek Konstruksi Bangunan Gedung di.